Fortescue Christmas Creek Concrete Works

Home | Mining | Fortescue Christmas Creek Concrete Works

Project Description

Fortescue recently engaged DDR to conduct earthworks and construct thee concrete pads for a new container laydown area at its Christmas Creek mine, located approximately 110km north of Newman, WA.The project scope comprised of all civil earthworks and construction of three concrete pads and footings including steel plates, including:

  • Excavation and leveling of work area
  • Installation of plastic membrane across designated pad area
  • Installation of formwork and both layers of reinforcing mesh
  • Pouring of footings and concrete
  • Application of brush finish to the final slabs
  • Installation of expansion joints and application of a polyurethane sealant

Project HIGHLIGHTS

  • Our team worked closely with the client and their concrete supplier to ensure scheduled works were delivered between shutdowns.
  • We were able to successfully navigated around high winds, dust and debris to ensure a high-quality finish for the client.
  • Client

    Fortescue Metals Group

  • DDR CONTACT

    Call DDR 1300 402 409

  • Project Type

Project Gallery

Related Projects

RAAF Base Learmonth Blast Walls

Construction, Defence

Dewatering Dome Shelter

Infrastructure Upgrades, Mining

Demolition

RAAF Learmonth Fuel Infrastructure Demolition

Construction, Defence

Anderson Point Shutdown Works

Mining

get In touch

Want more information about how we can help with your next project? Please call on 1300 402 409, email us at [email protected], or simply fill in this form and we will get back to you.
  • This field is for validation purposes and should be left unchanged.

See our Privacy Policy to learn more about how we use data.