RAAF Darwin Tin City Refresh

Home | Defence | RAAF Darwin Tin City Refresh

Project Description

The goal of this project is to refurbish and improve the four transit camps at the base, prolonging the life span of the facility and improving the overall usability and aesthetics of the buildings.

The camp is predominantly used for interstate and foreign troops during exercises and can accommodate over 800 people.

The scope of works comprises structural repairs, a complete re-paint, replacement of electrics, plumbing and flooring.

Project HIGHLIGHTS

  • Structural integrity: some of the older buildings were constructed in 1992, and having been subjected to extreme weather events, were in need of major repairs and waterproofing.
  • Usability of the buildings: maximising storage space for personal belongings within the rooms.
  • Replacement of services: such as electrics and plumbing with upgraded versions to comply with current industry standards and environmental regulations.
  • Client

    Department of Defence

  • DDR CONTACT

    Call DDR 1300 402 409

  • Project Type

Project Gallery

Related Projects

Darwin Truscott Club Refurbishment Works

Building Refurbishments, Defence

Combat Service Battalion Robertson Barracks

Building Refurbishments, Defence

Robertson Building Maintenance

Building Refurbishments, Defence, Infrastructure Upgrades

RAAF Darwin Sewer Works

Defence, Infrastructure Upgrades

get In touch

Want more information about how we can help with your next project? Please call on 1300 402 409, email us at [email protected], or simply fill in this form and we will get back to you.
  • This field is for validation purposes and should be left unchanged.

See our Privacy Policy to learn more about how we use data.